Chapter 2. Installation
2.3 Installation – Procedures
WARNING
and a system that uses fuel or gas. This can cause an explosion that can
cause death or injury, and/or damage to equipment.
High pressures and temperatures are dangerous (refer to sales data
sheet or customer specified drawing). De-pressurize and allow to cool
components in a system that has high operating pressures and
temperatures.
Note: Until installation, keep the unit in the original container with all the covers in
position. The container and covers prevent contamination and damage. When not in use,
keep the connections clean at all times, and put the covers on the open connections.

2.3.1 Pressure Connections (Absolute)

Connect the pressure transducer connection to the pressure system and torque tighten the
connection (refer to System Installation Manual).

2.3.2 Electrical Connections

Refer to the sales data sheet or customer specified drawing.

2.3.3 Completing the Installation

Do all the applicable tests and checks (refer to System Installation Manual).
After completing installation, the pressure transducer is ready for use.
4 | DPS 5000 Series Instruction Manual-English
Do not interchange transducers between an oil system