Installing chiller
Reserve sufficient maintenance space if possible.
If the unit is installed in a place where it snows in winter,
proper measures better be taken to protect the unit against
snow and ensure that the unit works properly.
Avoid installing the unit at below place as dirty, oil dirty,
high salt and high sulfide gas, installation at place with
flammable gas is forbidden.
The groundwork should be made of concrete or supporting
structures. While designing the groundwork, you must fully
consider the strength of the floor, water discharge (the unit
discharges water while working), pipeline and wiring. If the
floor is not strong enough, the unit might fall off and breakdown,
Rubber cushions
even incur bodily injuries.
Qty
4
Screw down the chilled water unit using anchor bolts so that it will
not fall off in case of strong wind or earthquakes. To avoid damages
Size
280X180X20
caused by strong wind or earthquakes, The unit must be securely
installed at a proper place to avoid direct hit of strong winds.
Depending on mounting conditions, operation vibration might pass
through the groundwork and generate noises in the floor and walls.
Therefore, proper vibration dampening mechanisms (such as
bumper cushion, bumper frame etc.) should be in place.
Corners and edges should be properly installed. Otherwise, the unit
might get unbalanced and cause the grounding pins to bend. The
unit might fall off and cause bodily injuries if it is not properly installed.