Installation; Product Receipt - ICI Caldaie ECOVAPOR Series Instructions For Installation, Use And Maintenance Manual

Steam generating unit with integrated burner
Table of Contents

Advertisement

4

Installation

The installation must be performed in compliance with the local standards by
specific technical skills in the field of the steam production system components. An incorrect installation may cause damage to
persons or property for which the manufacturer will not be liable.

PRODUCT RECEIPT

IMPORTANT
m
Upon receipt of the steam generating system, make sure that the supply is intact and undamaged and promptly
ICI CALDAIE S.p.A.
contact
The
ECOVAPOR
systems consist of:
– steam generating system complete with all its parts, any requested component included (assembled and tested).
– turbulators present inside the combustion chamber, to be inserted inside the flue gas tubes upon installation
– control panel made based on the generator to be managed
– gas train, to be assembled on the system upon installation
– pipe, vibration-damping joint and shutter.
The following documents are located inside the control panel:
– declaration of conformity
– use and maintenance manual
– safety valve(s) certificate, with declaration of conformity and use and maintenance manual
– feed pump(s) characteristic curve
– electrical diagram
– Instructions for:
- safety pressure switch,,
- pressure transducer,
- pre-amplifier,
- probe(s),
- gas valve.
IMPORTANT
m
All the supplied documentation is an integral part of the appliance and it MUST be carefully read before installing and
commissioning the generator, carefully stored for further consultations and it MUST always accompany the appliance.
Installation
if it does not correspond to the order
Qualified Personnel
, namely by personnel with
Gas Train
43

Advertisement

Table of Contents
loading

Table of Contents