Operation; Sequence Of Operation - Graco Dispensit 1052 Operation & Maintenance Manual

Patented meter and dispense system for precise one-component micro-dispensing
Hide thumbs Also See for Dispensit 1052:
Table of Contents

Advertisement

Operation

The operation of the 1052 metering valve is controlled
by an external source. If a 4104A Control Box was pur-
chased, see the 4104A Control Box manual for opera-
tion instructions.

Sequence of Operation

Step 1: Reload
Spool shifts to the right
Material feed inlet is opened
Material is transferred into the metering chambers
by a pressurized feed system
Outlet port is blocked
Metering rod is retracted to a precise position deter-
mining the volume of each material
3A0231E
Step 2: Shift
The balanced spool shifts to the dispense position
Material path to the needle is opened
Material feed inlet port is blocked
Metering rod remains in the retracted position
Step 3: Dispense
Metering rod extends
Material is dispensed from the metering chamber
into the needle
Upon completion of the dispense stroke, the metering
rod and spool shifts back to the reload position.
Operation
15

Advertisement

Table of Contents
loading

Table of Contents