Download Print this page

Mercia Garden Products 0634LOG209-V4 General Instructions Manual

5x5m (34mm) apex cabin

Advertisement

Quick Links

General Instructions
0634LOG209-V4 (5x5m)
0634LOG209-V4: 5x5m (34mm) apex cabin
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0634LOG209-V4 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0634LOG209-V4

  • Page 1 Winter = High Moisture = Expansion 0634LOG209-V4 (5x5m) Summer = Low Moisture = Contraction erected by two adults 0634LOG209-V4: 5x5m (34mm) apex cabin BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2 0634LOG209-V4 Overall Dimensions: Width = 5108mm Depth = 5832mm Log Board - 120x34x5500mm QTY 2 Height = 2869mm LB34-AE-5500 Base Dimensions: Width = 4818mm Log Board - 120x34x6000mm QTY 2 Depth = 4818mm LB34-AE-6000 Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Nail Bag Pre-assembly *Please note: 80mm Bolt Set x16 30mm Screw x 108 Each board interlocks at 70mm Screw x294 Felt Tacks x600 either end in a staggered pattern. 40mm Screw x1356 Before securing ensure that the boards are tted properly in their respective tongues and grooves.
  • Page 4 Please retain product label and instructions for future reference Step 2 Step 1 Parts needed - No. 14 QTY 27 Parts needed - No. 14 QTY 9 No. 15 QTY 6 No. 15 QTY 2 Following the same method Lay the Bearers (No. 14 outlined in Step 1 , build &...
  • Page 5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 4 (See Pre-Assembly) Step 3 (See Pre-Assembly) Parts needed - No. 5 QTY 12 Parts needed - No. 6 QTY 12 No. 7 QTY 12 No.
  • Page 6 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 6 Step 5 (See Window-Assembly) Parts needed - No. 1 QTY 2 Parts needed - No. 1 QTY 2 Ensure that the lip of the Refer to window assembly instructions to assemble window frame is located on...
  • Page 7 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 7 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Step 8 (See Pre-Assembly) Parts needed - No. 6 QTY 14 Parts needed - No. 8 QTY 1 No.
  • Page 8 Please retain product label and instructions for future reference Step 10 Step 11 Parts needed - No. 16 QTY 5 Parts needed - No. 13 QTY 108 Align the Roof Purlin(s) (No. Place the rst two roof board’s 16) into the cut out slots on each (No.
  • Page 9 Please retain product label and instructions for future reference Step 12 Step 13 Parts needed - No. 19 QTY 6 Parts neeeded - No. 12 QTY 84 Ensuring the roof boards are Place the rst oor board (No. 12) ush at the overhanging side and inside the building ush to the log meet at the apex, x the Eaves board on one side.
  • Page 10 Please retain product label and instructions for future reference Step 14 Step 16 Part needed - No. 22 Parts needed - No. 20 QTY 9 Roof Roof Cut the felt into seven strips & lay Inside the building place the closure trim (No.
  • Page 11 Please retain product label and instructions for future reference Step 17 Step 18 Parts needed - No. 17 QTY 4 Parts needed - No. 21 QTY 8 No. 18 QTY 6 Arrange the storm braces (No. 21) Align the fascia’s (No’s. 17 & around the building (internally ).