4.

First start up

4.�

Unpacking

1. Remove the packaging paying attention to nails
detaching.
i
After unpacking check the integrity of TCE 5310 and
check that no components are visibly damaged. In
case of doubt do not proceed to start-up and con-
tact a qualified technician and/or your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.2

Installation

4.2.�

Machine positioning

1. Insert the appropriate lifting belts (length belt 1: 1.5
Mt, belt 2: 2 Mt), with sufficient capacity, as shown.
Warning - tilting danger!
The barycentre of the TCE 5310 is not in its
centre.
It is necessary to lift the machine slowly.
|
1 695 301 840
2011-07-14
2. Lift the TCE 5310 with a lift crane and install it in
the chosen area respecting the minimum distances
shown in the picture.
i
For safe and ergonomic use of the TCE 5310 it is
recommended to leave a minimum of 750 mm space
from the nearest wall and of 900 mm from the cei-
ling.
Warning - tilting danger!
During tire inflation considerable forces are
exerted.
The TCE 5310 has to be fixed in at least 3
TCE 5310 has to be fixed in at least 3
points on the floor.
has to be fixed in at least 3