Appendix B - Maintenance - Ozone Solutions Waterzone Series Installation & Operation Manual

Ozone injection system
Hide thumbs Also See for Waterzone Series:
Table of Contents

Advertisement

All major components requiring maintenance have guidelines listed in the respective operation manuals. Refer to
those individual operation manuals for other preventative maintenance and regular maintenance information.
Maintenance Table
Component
Compressed Air Filter
Compressor Inlet Air Filter Replace inlet air filter
Dissolved Ozone Monitor
Ozone Leak Sensor
ORP Sensor
Check Valves
Air Compressor
ODS-1H Destruct Unit
Injection Pump

Appendix B - Maintenance

Action
Replace filter element
Replace cap and electrolyte 6 months/as needed
Replace sensor
Replace sensor
Replace
Rebuild compressor
Replace Catalyst
Replace/rebuild pump
Tim Interval
Part Number(s)
3 months/as needed
PR-8: Replacement filter
3 months/as needed
CP-Filter-4: Replacement Element
AS-500-Flat cap & AS-500-
electrolyte
Annually
SEN-1
Annually
ORP-Sensor
Annually
CVLP-4 and CVHP-8
Annually
CP-OG Rebuild
Annually
ODS-Catalyst
3-5 years
CM5-G Rebuild
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Waterzone 20

Table of Contents