Installation; Checking Before Installation; Tools - Huawei SUN2000 Series User Manual

Hide thumbs Also See for SUN2000 Series:
Table of Contents

Advertisement

4.1 Checking Before Installation

Outer Packing Materials
Before unpacking the inverter, check the outer packing materials for damage, such as holes
and cracks, and check the inverter model. If any damage is found or the inverter model is not
what you requested, do not unpack the package and contact your supplier as soon as possible.
Package Contents
After unpacking the inverter, check that the contents are intact and complete. If any damage is
found or any component is missing, contact your supplier.

4.2 Tools

Type
Tool

Installation

Tools
Hammer drill
Drill bit: Φ8 mm and
Φ6 mm
Issue 02 (2019-04-30)
You are advised to remove the packing materials within 24 hours before installing the inverter.
For details about the number of contents, see the Packing List in the packing case.
Socket wrench set
Copyright © Huawei Technologies Co., Ltd.
SUN2000-(3KTL-10KTL)
4
Installation
Torque screwdriver
Phillips head: M3
User Manual
Diagonal pliers
Page 21 of 81

Advertisement

Table of Contents
loading

Table of Contents