Download Print this page

Operation; Installation - Frico Comfortline AZR Series Manual

Advertisement

Available languages

Available languages

General Instructions
Read these instructions carefully before
installation and use. Keep this manual for
future reference.
The guarantee is only valid if the units
are used in the manner intended by the
manufacturer and in accordance with the
Frico mounting and operating instructions.
Application area
The Comfortline AZR air curtain unit is
supplied with electrical heating or hot water
coil and is intended for installation above
entrances and smaller doors up to 3.5 metres
in height.
AZR is recessed in false ceilings above
entrances.
Protection class above roof: IP23,

Operation

Air is drawn in from underneath and blown
out downwards towards the entrance so that
it shields the door opening and minimises
heat loss. To get the best curtain effect the
unit must extend the full width of the door
opening.
The grille for directing exhaust air is
adjustable and is normally angled outwards to
achieve the best protection against incoming
cold air.
The air speed is adjusted to the desired
airflow.
The efficiency of the air curtain(s) depends
on the air temperature, pressure differences
across the doorway and any wind pressure.
NOTE! Negative pressure in the building
considerably reduces the efficiency of the air
curtain. The ventilation should therefore be
balanced!

Installation

AZR unit is installed horizontally with the
supply air grille facing downwards as close to
the door as possible, concealed in the false
ceiling. The only visible part of the unit is the
underside that is level with the ceiling.
Ensure that the service hatch is accessible
and can be fully opened.
Comfortline AZR E/W
Assembly and operating instructions
1. The mounting bolts (M8) will be included in
the delivery.
2. Hang up the unit with the bolts (M8)
according to figure 2 on p.3.
3. Adjust the height using the nut so that the
frame is on the same level as the ceiling.
Lock using the nut.
Electrical installation
The air curtain(s) should only be wired by a
competent electrician and in accordance with
the latest edition of IEE wiring regulations.
1. The service hatch is opened by screwing off
the screws on lower body of the unit .
2. The unit is supplied through holes on the
side of the unit. The cable glands used must
meet the protection class requirements.
Only applies to AZR E
Connections are made using EKK, EKLK
or corresponding type cables. The cable
glands used must meet the protection class
requirements.
Type
Output
[kW]
15
AZR1000E
AZR1500E
22,5
30
AZR2000E
Connecting the water coil (AZR W)
The installation must be carried out by an
authorised installer.
The water coil has copper tubes with
aluminium fins and is suitable for connection
to a closed water heating system. The heating
coil must not be connected to a mains
pressure water system or an open water
system.
The unit is supplied through holes on the
side of the unit (DN20, 3/4").
The connections to the heating coil must be
equipped with shut off valves to allow problem
free removal.
GB
Voltage
Minimum
[V]
area
[mm
]
2
400V3~
6
400V3~
10
400V3~
16
15

Advertisement

loading