Ordinary Maintenance - Sigma PE 7.5 Instruction Book

Planetary mixer
Table of Contents

Advertisement

12)ORDINARY MAINTENANCE

first three months
i
Problems with the
micro of the grid:
remove the cover that
protects the gears,
check the functioning,
replace the cover and
test the machine.
When the tool's pin is
broken remove the tool,
close it in a vice, remove
the pin with the
appropriate tool F 5-6
mm, insert a new pin and
attach the tool to the
shaft.
ATTENTION: The machine is not waterproof, therefore whatever cleaning process must
not involve a jet of water.
If the power supply cable becomes damaged it must be substituted with a H07RN/F cable
with a cross-sectional measurement of 3x1,5 mm
ANY CHECK OR MAINTENANCE OPERATION SHOULD BE
CARRIED OUT ONLY WHEN THE MIXER IS UNPLUGGED AND
POWER IS DICONNECTED. The machine does not need particular
maintenance operations. Check worn-out level of the belts after the
2
.
To tighten the belt
unscrew the motor's
bolts and lever with a
screwdriver.Close the
motor's bolts,replace
the cover and test the
machine
Problems with the
micro of the bowl:
remove the back
cover, check the
functioning, replace
the cover and test the
.
machine
10

Advertisement

Table of Contents
loading

Table of Contents