WRITTEN PERMISSION OF MEIKO WILL IMMEDIATELY VOID THE MANUFACTURER’S WARRANTY. Meiko reserves the right to change any specifications without notice at any time. Meiko • 1349 Heil Quaker Boulevard • La Vergne, TN 37086 Phone: (615) 399-6600 • (800) 55-MEIKO • Fax: (615) 399-6620 www.meiko.us...
A volume reduction of up to water trough. Waste is moved through the 85% is possible using the AZP 80 with normal machine by the flow of water controlled by kitchen waste. A 70% reduction is typical.
IMPORTANT Vital information or tips for The appliance’s warranty is not valid until a the installer or operator. Meiko Authorized Service Agent performs a Startup and Demonstration on the appliance. NOTE Information or tips for the This Demonstration should be scheduled after installer or operator.
3 - I ECTION NSTALLATION 3.2 Requirements Before Installation extent of damage present. Meiko will file a freight claim based on this information. Before the installer can uncrate and move the appliance to the installation location, the fol- 3. Move the appliance to the installation area lowing conditions MUST be met: and remove the skid.
Seal the connection with silicone trough (supplied by others), when constructed sealant to prevent water leakage. to drawings supplied by Meiko, will 2. Attach the recirculating water line to the incorporate a matching plate to allow for machine’s 2” OD pipe connection using connection to the pulper.
3 - I ECTION NSTALLATION 3.5 Accessing the Utility Connections The utility connections for the machine are shown in Figure 3-3. Figure 3-3: Utility connections Dual valve connection: Cold water Left-to-Right Machines Single valve connection: Warm water Main electrical supply terminal block Strain relief for main...
Strain reliefs are provided in 5. Adjust the strain relief to fasten the wiring the back wall of the main AZP 80 electrical in place. You should leave enough slack compartment, and on the bottom of the in the wiring to prevent stress on the remote control box.
The water supply connections for the waste pulper are located behind an access panel 3. Check the incoming water hardness. Meiko recommends a hardness of 4-6 on the front of the machine. Both connections grains per U.S. gallon for proper operation are 3/4”...
3 - I ECTION NSTALLATION 3.9 Drain Connection IMPORTANT 3. If a floor drain is not directly beneath the In some cases, local codes dictate that drain machine drain, or if local codes require a connections be made only by a certified trap, a drain line can be attached using professional.
3 - I ECTION NSTALLATION 3.10 Installing a Deodorizing System guidelines when loading waste into the machine. If the machine will be equipped with a The following waste can be processed: deodorizing system (supplied by others), it should be installed at this time in an •...
4 - O ECTION PERATION PERATION 4.1 Location and Description of Controls The dishwasher controls are on the loading end of the machine. See Figure 4-1. Figure 4-1: Waste pulper controls Right-to-Left Left-to-Right Machines Machines Drain open Drain closed Drain open Drain closed...
4 - O ECTION PERATION A - ON button 4.2 Startup Turns the machine on and begins the tank Check that the scrap basket is in place at the filling process. As the tank fills, the ON button bottom of the tank. Then, close the tank cover. will illuminate.
4 - O ECTION PERATION 4.3 Loading For the most efficient operation: Be sure to follow these guidelines when loading waste into the machine. • Load the waste steadily, instead of in large The following waste can be processed: batches or “piles.” •...
Clean the machine as described in the spoon or the wooden handle of a Section 5, Cleaning. Meiko recommends broom or mop. that the tank access door be left open overnight to allow the tank to air thoroughly.
5 - C ECTION LEANING 1. Open the tank access door. LEANING 2. Thoroughly flush the loading chute, For proper operation and effective cleaning, washing in the direction of operation the dishwasher should be cleaned regularly (towards the tank) using a low-pressure as described below.
5.2 Weekly or As Required 11. Check that the screw is properly seated by checking the tower’s top cover. If the Meiko recommends that the following screw is installed correctly, the top cover cleaning procedures be performed at least will close easily and snap into place. If once per week.
Never use a high-pressure water spray the interior of the waste pulper if it is operated when cleaning the machine. using a hard water supply. Meiko recommends a hardness of 4 grains per U.S. gallon (7 DH • Leave the doors of the machine open.
Contact your Meiko Authorized Service Agent if you cannot correct the problem. An Authorized Service Agency Listing was supplied with your waste pulper. If you do not have the listing, call 1-800-868-3840 for assistance, or visit Meiko’s website at www.meiko.us.
Page 20
If you need service... Meiko waste pulpers are designed for solid reliability as much as for outstanding performance. With proper care, your waste pulper should provide years of trouble-free operation. If service is necessary, contact your local Meiko Authorized Service Agent.
Need help?
Do you have a question about the AZP 80 and is the answer not in the manual?
Questions and answers