C&D Technologies TEL Series Installation And Operating Procedures

C&D Technologies TEL Series Installation And Operating Procedures

True front access batteries
Hide thumbs Also See for TEL Series:

Advertisement

RS02046
Installation and Operating Procedures
For C&D Technologies TRUE Front Access TEL Series Batteries
FOLLOW MANUFACTURER'S PUBLISHED INSTRUCTIONS WHEN
INSTALLING, CHARGING AND SERVICING BATTERIES.
For additional information:
www.cdtechno.com
Technical-Warranty Assistance, contact:
C&D Technologies, Inc.
1400 Union Meeting Road / PO Box 3053 / Blue Bell, PA 19422-0858
800-543-8630 or 215-619-2700
Fax 215-619-7899
Before handling cells or storing cell for future installation take time to read this manual. It contains
information that could avoid irreparable damage to the battery and/or void product warranty.
RS02046/0514/CD
www.cdtechno.com

Advertisement

Table of Contents
loading

Summary of Contents for C&D Technologies TEL Series

  • Page 1 RS02046 Installation and Operating Procedures For C&D Technologies TRUE Front Access TEL Series Batteries FOLLOW MANUFACTURER’S PUBLISHED INSTRUCTIONS WHEN INSTALLING, CHARGING AND SERVICING BATTERIES. For additional information: www.cdtechno.com Technical-Warranty Assistance, contact: C&D Technologies, Inc. 1400 Union Meeting Road / PO Box 3053 / Blue Bell, PA 19422-0858...
  • Page 2: Battery Description

    General: The purpose of this manual is to inform installers how to receive, install and maintain C&D Technologies front access batteries. Battery Description: The Valve Regulated Lead Acid (VRLA) battery is a minimal maintenance system utilizing an oxygen recombination cycle to minimize gassing and eliminate electrolyte maintenance. The dilute sulfuric acid electrolyte is immobilized by absorbent glass mat (AGM) separators.
  • Page 3: Receiving Instructions

    Code (NEC) and other applicable building codes. Please note that for sealed cabinets with VRLA gas removal provisions, the C&D TEL Series batteries with gas collection (G suffix) and the optional tubing kit can be utilized (see Diagram in Section V of this document) •...
  • Page 4: Storage Instructions

    III. Storage Instructions Store batteries in a clean, dry, cool area away from radiant heat sources. Recharge batteries in storage at least every 6 months or before their OCV declines to 12.48 VDC. Follow instructions as outlined in Section VI. Freshening Charge.
  • Page 5 Series -48VDC connection of individual front access batteries Step 1. If installing in a multiple tier rack or cabinet arrangement, always begin with the lowest shelf, string A, place each the individual front access batteries on the shelf (typically 4 per level) with approximately 1/2 inch spacing between the individual units.
  • Page 6 Series +24VDC connection of individual front access batteries Step If installing in a multiple tier rack or cabinet arrangement, always begin with the lowest shelf, string A & B, place each the individual front access batteries on the shelf (typically 4 per level) with approximately 1/2 inch spacing between the individual units.
  • Page 7: Freshening Charge

    V. Optional Gas Collection System Installation (tubing kit PN 15028596) TEL Series Models with ‘G’ in the product suffix (i.e. TEL12-105FNSG) include a gas collection system feature which allows the hydrogen and oxygen gases that may vent from the battery to be directed to a specific cabinet exit location by the installation of 6mm or ¼”...
  • Page 8: Periodic Maintenance

    VIII. Initial Installation Data The following initial installation data should be maintained on site: • Date and Initial open circuit voltage of unit(s) at time of delivery to the site. • Freshening charge records, if performed. • Initial torque value used for connections. •...

This manual is also suitable for:

Tel12-105fnsgTel12-105fnsTel12-115fnTel12-115fngTel12-145fwTel12-155f ... Show all

Table of Contents