Download Print this page
C&D Technologies TEL Series Installation And Operating Procedures

C&D Technologies TEL Series Installation And Operating Procedures

Hide thumbs Also See for TEL Series:

Advertisement

Quick Links

RS-2046
Installation and Operating Procedures
For
C&D Technologies TRUE Front Access TEL Series Batteries
FOLLOW MANUFACTURER'S PUBLISHED INSTRUCTIONS WHEN
INSTALLING, CHARGING AND SERVICING BATTERIES.
For additional information:
www.cdtechno.com
Technical-Warranty Assistance, contact:
C&D Technologies, Inc.
1400 Union Meeting Road / PO Box 3053 / Blue Bell, PA 19422-0858
800-543-8630 or 215-619-2700
Fax 215-619-7899
Before handling cells or storing cell for future installation take time to read this manual. It contains
information that could avoid irreparable damage to the battery and/or void product warranty.

Advertisement

loading
Need help?

Need help?

Do you have a question about the TEL Series and is the answer not in the manual?

Questions and answers

Summary of Contents for C&D Technologies TEL Series

  • Page 1 RS-2046 Installation and Operating Procedures C&D Technologies TRUE Front Access TEL Series Batteries FOLLOW MANUFACTURER’S PUBLISHED INSTRUCTIONS WHEN INSTALLING, CHARGING AND SERVICING BATTERIES. For additional information: www.cdtechno.com Technical-Warranty Assistance, contact: C&D Technologies, Inc. 1400 Union Meeting Road / PO Box 3053 / Blue Bell, PA 19422-0858...
  • Page 2: Installation Tools And Materials Required

    Digital Voltmeter – not provided Battery Numbers – not provided Terminal Prep Supplies – not provided TEL Series Front Access batteries 100FS/160F/180F Bus Bar (included 1 per unit) 160FW Bus Bar – (included 1 per unit) PB00540 Bolt ¼ 20 (included 2 per unit) PB01706 Washer 1/4”...
  • Page 3 lll. Receiving Instructions Upon receipt, inspect the batteries for physical damage to the containers and terminals. If found, a claim must be filed with the carrier within 10 days. Also check the packing slip to make sure all material has arrived.
  • Page 4 Step 3b. If more than one 48 VDC string is within the enclosure, number the additional batteries the same way. Identify the bottom string as string A with the string above as string B and so on (see Figure 2). Step 4.
  • Page 5 Step 1. Beginning with the lowest shelf containing string A & B, place each of the individual front access batteries on the shelf (4 per shelf) with approximately 1/2 inch spacing between the individual units. All the batteries should be placed with terminals to the front of the rack / shelf. Remove and save terminal protectors (see Figures 5 &...
  • Page 6: Quarterly Inspection

    Step 17. Repeat the above steps on String B, String C, String D, String E, etc. Parallel Connection of individual strings of batteries C&D recommends each of the individual battery strings be cabled separately to a common junction point or box. Each string should also contain a separate fuse or disconnect switch to facilitate maintenance, see Figure 2 &...
  • Page 7 7 of 12...
  • Page 8 8 of 12...
  • Page 9 9 of 12...
  • Page 10 10 of 12...
  • Page 11 11 of 12...
  • Page 12 12 of 12...

This manual is also suitable for:

Tel 12-105fsTel 12-160fwTel 12-160fTel 12-180f