Download Print this page

Eastwood 30721 Instructions Manual page 8

Benchtop blast cabinet

Advertisement

INSTALL BLAST GUN/HOSE ASSEMBLY (R)
& PERFORATED FLOOR (H) (FIG 8)
• Place the Cross-Drilled Pickup Fitting of the Abrasive Gun and
Hose Assembly (R) through the grommeted hole in the Perfo-
rated Floor (H) (FIG 8D).
• Place the Cross-Drilled Abrasive Pickup Fitting of the Abrasive
Gun and Hose Assembly (R) through the hole in the bottom
of the Hopper Panel (J) (FIG 8A) and secure it with the large
15mm Nut and Washer (FIG 8B).
• Place the Abrasive Blasting Gun (R) Air Supply Hose Fitting
through the through hole in the lower rear of the Cabinet Right
Side Panel (E) using a large fl at washer on either side. Wrap
thread sealing tape around fi tting threads and secure with the
Air Supply Fitting Nut (FIG 8C).
INSTALL PEEL-OFF SHIELD
• The interior side of tempered glass window of the Lid (A) is
equipped with a replaceable, full-view, peel-off, self-adhesive
fl exible window shield. It will become cloudy with use.
TO REPLACE:
• Peel off worn protector.
• Gently clean glass with a soft cloth and glass cleaner or alcohol.
• Peel off adhesive protective strips and apply replacement shield
to interior glass surface. Press on adhesive areas to ensure an
abrasive proof seal.
Congratulations! Your fully assembled Eastwood Bench-Top Blast
Cabinet is now ready to be filled with media and be put to work!
8
FIG. 8
FIG. 8
H
J
FIG. 8A
FIG. 8A
FIG. 8D
FIG. 8D
Pass Hose & Fitting
through hole
Eastwood Technical Assistance: 800.544.5118 >> techelp@eastwood.com
E
FIG. 8B
FIG. 8B
R
FIG. 8C
FIG. 8C
R
Pickup
Fitting

Advertisement

loading