Setting The Irrigation Start Day And Time - Galcon G.S.I DC Installation & User Manual

Table of Contents

Advertisement

G.S.I DC Installation and Operation Guide
4. After setting the desired cycle length, press  to progress to the
next screen, which automatically saves the change.

Setting the Irrigation Start Day and Time

The start day is the number of days between the day you define an
irrigation program (today) and the day the program actually begins
operating. The start time is the time of day the program begins.
To set the start day and time:
1. From the Main screen, press  until the Start Day screen appears
(Figure 37).
The default display is d 00 which indicates zero days. If you set this
value for the start day, the irrigation program will start on the
current day at the defined start time. If that time has already
Figure 36: Six Day Cycle Setting Example
Figure 37: Start Day Screen Example
29

Advertisement

Table of Contents
loading

Table of Contents