Carrier AquaEdge 19DV Series Installation Instructions Manual page 34

Table of Contents

Advertisement

COND
2ND STAGE END VIEW
Copyright 2019 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53190055-01
32
32
2ND STAGE END
EVAP
FACTORY INSTALLED INSULATION
Fig. 26 — 19DV Insulation Area
Printed in U.S.A.
CONDENSER
EVAPORATOR
TOP VIEW
FRONT VIEW
FIELD SUPPLIED AND INSTALLED
INSULATION (IF REQUIRED)
Form 19DV-CLT-2SI
Pg 34
1ST STAGE END
COND
EVAP
1ST STAGE END VIEW
5-19
Replaces: 19DV-CLT-1SI

Advertisement

Table of Contents
loading

Table of Contents