Download Print this page

Oven Setup - OTS PDQ Rollabout 5A Manual

Advertisement

7.
Open the door (We suggest you secure the door in the open
position with a length of rope. Since it has nothing to re-
tain it at this point, it could potentially snap closed, caus-
ing injury.) and snap the gas shocks on to the ball studs
built into the door. Secure in place with the retaining pins.
(see drawing)
PDQ door shock clip assembly:
8.
The oven should be bolted to the floor to insure that the door
and cart operate properly. The location of the front legs can
be determined by measuring the width of the door opening at
the top and using that same measurement for the bottom of
the door opening. Not bolting the legs to the floor can lead to
jamming of the door or cart.
9.
Install the door handle using the 4 screws provided. (The
screws are shipped in their appropriate holes in the door to
keep the door trim secure during shipping.)
10. Remove the light guards from the light panel to provide ac-
cess to the L-Brackets. (see pictures next page)

Oven Setup

5

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Pdq rollabout 6bPdq rollabout 7cPdq rollabout 8d-2,8e