Download Print this page

Oven Setup - OTS PDQ Rollabout 5A Manual

Advertisement

To save you freight cost and prevent damage to your new PDQ Oven,
we have shipped it to you partially disassembled. These assembly
instructions and diagrams should make setup fairly simple. You will
require 2-4 people, a 7/16" wrench and a 1/8" and 5/32" hex wrench,
along with the included hardware kit, to complete the setup.
1. Unband and unpack the oven. (Caution: Rollabout ovens
have tubes wrapped to the back containing the infrared
emitters, handle with care.)
2. The oven MUST be slid back 2"-4" away from the cart
before lifting.
3. Lifting the side of the oven opposite the control panel,
insert the round section of the legs into the leg holes on the
underside of the oven. (see drawing) Install the hex bolts
through the hole in the leg support into the threaded hole
on the underside of the oven and tighten the two set screws
for each leg a 1/8" hex wrench. Lift the control panel side
of the oven and repeat the process. (Note that the angled
supports on the legs run from front to back on the two
front legs and side to side on the back legs.)

Oven Setup

3

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Pdq rollabout 6bPdq rollabout 7cPdq rollabout 8d-2,8e