How to Install the Allegro
PARTS INCLUDED:
Item No. Part Number Description
1
618-030
2
618-031
3
618-021
4
614-020
5
GEN8320
6
GEN7321
7
GEN7325
8
GEN9021
9
GEN9282
10
618-135
11
GEN9600
12
GEN6742
13
GEN9856
14
GEN9059
15
GEN9284
16
FAK1000
2
3
4
7
8
13
Allegro Leg, A
Allegro Leg, B
Leg Nut Plate
Wheel Bracket, Allegro Ext
Leg
Allen Key, 3/16" Ball Point
Screw, Button Head, 5/16-18
x 3/4"
Screw, 1/4-20 x 3/4"
Nut, Nylock, 1/4-20
Allen Key 5/32" Short Arm
Polyurethane Foot Pads
Double Sided Tape
Flat Head Screw 10-24 x
5/8"
#10 Flat Washer
#10 Nylon Nut
1/8" Allen Wrench
Alcohol Wipe
10
5
6
16
12
14
Legs Kit
®
TOOLS NEEDED (NOT INCLUDED):
» Two 1/2" or adjustable wrenches
Qty
2
» One 7/16" wrench
2
2
» 3/8" wrench or socket
2
PREPARE THE NEW PADS
1
12
1. Remove the legs and other materials from the packaging and
lay the legs on the floor with the bottom of the leg facing up,
so the "L" shape face with three holes are on the floor
4
4
2. Remove the (4) Polyurethane foot pads, and (1) Alcohol wipe
1
from the packaging. Open one wipe and thoroughly wipe
4
down the top side of each foot pad. This is the side opposite
the ribbing. If the wipe is dirty or becomes too dry use another
4
wipe for the remaining pads. Set the pads aside and let these
4
dry.
4
3. Open an Alcohol wipe to clean the bottom of each metal foot
on the reformer. If needed use a secondary wipe.
4
1
4. If you have a Tower Of Power installed, remove the ropes,
4
loosen the 4 tower knobs, and remove the tower.
5. Using the included shorter allen wrench, remove the 4 screws
holding the head end cover plates and riser pins in place. Set
them aside to be re-installed later. See Figure A.
1
11
15
9
Figure A
Contact Us
1-800-PILATES | +1-916-388-2838
pilates.com | info@pilates.com
400-316 | 08.31.18