IMPORTANT: Before installing, read ALL SAFETY INSTRUCTIONS and WARNINGS
Step 1. Install the Power Center
1. Unpack Power Center box and remove components and mounting hardware. Each Power
center box should include the following:
1 x Power Center (Pre-Assembled)
1 x LOOP® IC Controller, IR Remote, IR Cable & Mounting Hardware
1 x Surge Protector Power Strip
1 x Mounting Hardware Kit:
1 x Velcro Strip
4 x Wood Mounting Screws
2 x Cable Holders w/Mounting Screws
2 x Cable Tie Wraps
2. Check all DC cables, microUSB cables and
AC plugs on transformers and ensure all are
firmly plugged in.
3. Locate where the Power Center will be installed. The minimum space required is:
16.5"L x 7"W x 13"H. The surface must be flat and in a dry location protected from water and
salt creep. It MUST be mounted to a surface in a vertical position, DO NOT set Power Center on
stand floor due to a risk of water damage. We recommend the following locations:
Power Center Installation
Stand Back Panel
3
Location
Stand Side Walls
DO NOT REST
ON STAND FLOOR
LOOP® Marine Bundle Kit
Quick Start Guide
P3
P2
P1
L2
L1
2
Ensure all cables
are plugged in
Page 2
Need help?
Do you have a question about the LOOP 4300 and is the answer not in the manual?
Questions and answers