Trane BAYUVCLK001 Installer's Manual page 9

Ultraviolet (uv-c) lamp kit for 2-5 ton air handlers
Table of Contents

Advertisement

IMPORTANT: The ballast and bracket assembly is provided
with aggressive adhesive on back with peel-off liner. Before
removing adhesive liner, temporarily place ballast and bracket
assembly into unit to determine proper mounting location.
IMPORTANT: For 17.5" wide cabinets, Do Not remove the
adhesive liner. The ballast will be held on by screws only
allowing for easy removal to access to the blower plug if
needed.
STEP 13. Test fit by carefully placing the ballast and bracket assembly
in the unit.
The ballast should be level and resting on the air handler cross bar.
The notch of the ballast assembly will slide into the ridge of the
air handler. Ensure a solid fit before removing peel-off liner and
exposing the adhesive back.
Note: Be careful not to trap or pinch wires behind or below the
ballast assembly.
STEP 14. Once a proper dry fit has been verified, use the isopropyl alco-
hol swabs to clean the area where the ballast is to be mounted.
1. Remove the adhesive liner and follow the previous steps. Do not
let the adhesive backing touch the cabinet until the ballast is in
place.
2. Once the ballast assembly is in place, apply firm pressure to secure
to the inner wall of the air handler.
18-GJ11D1-2
3
Ballast assembly
bracket that rests upon
the cross bar.
Air handler
ridge
Notch
1
2
Ballast
assembly
front
flange
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents