Trane BAYUVCLK001 Installer's Manual page 7

Ultraviolet (uv-c) lamp kit for 2-5 ton air handlers
Table of Contents

Advertisement

Ballast assembly installation
HAZARDOUS VOLTAGE!
be present. Disconnect all electrical power, including remote
disconnects, before servicing. Follow proper lockout/tagout
procedures to ensure the power can not be inadvertently
energized. Failure to disconnect power before servicing could
result in death or serious injury.
IMPORTANT: For easy of installation, the Power Plugs must be con-
nected before installing the ballast as
IMPORTANT: The ballast assembly is provided with aggressive adhe-
sive on back. The adhesive has a peel-off liner. Do not remove the liner
until proper mounting locations within the unit have been confirmed.
NOTE: Use isopropyl alcohol to thoroughly clean and dry the surfaces
of the inside coil compartment wall in the areas where the ballast as-
sembly will be permanently mounted.
STEP 10. Disconnect the high voltage wiring harness on the right
side of the indoor coil.
18-GJ11D1-2
WARNING
!
Multiple power sources may
sembly in the unit.
Scribe Line
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents