Trane BAYUVCLK001 Installer's Manual page 6

Ultraviolet (uv-c) lamp kit for 2-5 ton air handlers
Table of Contents

Advertisement

STEP 5. Once a proper dry fit has been verified, use the alcohol
swabs to clean the area where the bracket is to be mounted.
STEP 6. Remove liner from adhesive on back of bracket and care-
fully place bracket in coil compartment.
STEP 7. Apply pressure firmly over all areas of the bracket to
permanently secure the adhesive to the coil compartment
inner wall.
Left Side UV Lamp bracket installation
STEP 8. Cut the cable tie on the left side lamp bracket assembly.
Slide the lamp and reflector assembly out of the lamp bracket
as shown.
STEP 9. Measure 7.5 inches above the cross bar and make a
mark on the inside of the air handler cabinet. Follow the same
process as the right side bracket.
Perform a dry fit test before cleaning the air handler cabinet and
securing the bracket in place.
6
End View
3.
L o
B ra
-
7.5"
Cross bar
Scribe Line
e
l L in
p
n ta
ri zo
f L
am
H o
m o
ib e
tt o
S cr
B o
n g
ca ti
ck et
18-GJ11D1-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents