The Shipkit; After Unpacking - Oracle Sun Netra FT 1800 Site Planning Manual

Table of Contents

Advertisement

The Shipkit

The shipkit box accompanying the system contains some or all of the following
items:
Manuals:
Environmental filter assemblies
Toolkit for unshipping the system (contained in a cloth bag):
Cable hooks for the cable management system
Software licenses:
Note – The software kit and manual set are orderable as separate items. The system
is pre-loaded and pre-configured with the software, and the manuals shipped with
the system are all that are required in order to install the system and start it up.

After Unpacking

You should use the instructions given in the Netra ft 1800 Hardware Installation
Manual and the Netra ft 1800 Hardware Release Notes (if present) to unship and
mount the system.
Note – This equipment is only intended for installation in a Restricted Access
Location as defined by UL1950, 3rd Edition, and EN60950: 1992 / A11: 1997.
A lifting device will be required to lift the system into a rack, even if all modules are
first removed from the chassis. The system weighs at least 230 kg (500 lb) when fully
loaded. After the system is unshipped from the wooden pallet, the lifting device
should be inserted in the space between the top and bottom of the sacrificial
mounting plinth as shown in
may result in deformation of the chassis and subsequent failure of the system to
function correctly.
2
Netra ft 1800 Site Planning Guide • February 2000
Hardware Installation Manual
Hardware Release Notes (where necessary)
Compliance and Safety Manual
Phillips No.2 screwdriver
12 mm Allen key
Sun StorEdge Volume Manager
Solaris operating environment
on page 4. Any other lifting method or point
FIGURE 1-2

Advertisement

Table of Contents
loading

Table of Contents