4. Replace the lamella (H), the O-rings (I and K) and
the clamps (C and J).
H
K
Overview (AY 27, AY 37, AY 47, AY 57, AY 67, AY 77, AY 87, AY 107)
N
H
L
To disassemble and assemble the
vibrator head (AY 27, AY 37, AY 47,
AY 57, AY 67, AY 77, AY 87, AY 107)
Overview (AY 27, AY 37, AY 47, AY 57, AY 67,
Refer to
AY 77, AY 87, AY 107) on page 7 for the illustration
related to this task.
1162 - 001 - 26.03.2020
J
I
C
M
K
I
N
5. Lubricate all the parts lightly.
6. Assemble the vibrator head in the opposite
sequence.
7. Tighten the end cap to the correct torque. Refer to
Tightening torque and threadlocker type on page
8 .
F
G
E
B
C
1. Disconnect the air valve (A) from the hose holder
(B).
2. Cut the clamp (C).
3. Remove the hose (D) from the hose holder (B).
4. Cut the clamp (E) and release the inlet hose (D) from
the hose nipple (G).
D
O
A
7