Step 4:
If replacing shear rams, shear ram holders, or handle, remove the two
M10x60 bolts using two 16 mm wrenches.
Servicing
Step 1:
Every 100 cuts or when all wires are no longer cutting cleanly, inspect
the threaded rod and top block for thread damage and replace as
necessary. Inspect the blade for worn or chipped edges and replace if
necessary. In case of bad cuts, try to retighten the screws.
Document No: 720900-1
Issue Date: 2018-Sep-20
Revision: C
Page 8 of 13
This document and all copies are the property of Safeworks. All dimensions and data are indicative only.
The user must ensure that the equipment complies with local rules and regulations.