Summary of Contents for SportsPlay Equipment SENSORI TUNNEL 521-105
Page 1
PACKING LIST 1 - 301-121 Crawl Thru 1 - 311-102 Up/Down Crawl Thru NOTE: The Tunnel sections should be assembled and installed with the sliding boards butting together. Sportsplay Equipment, Inc 5642 Natural Bridge, St. Louis, MO 63120 (314) 389-4140...
Page 2
* If resilient surfacing is to be less than 12”, then additional pipe should be put in concrete to maintain proper finish grade for equipment. Footing Layout and Use Area: Sportsplay Equipment, Inc 5642 Natural Bridge, St. Louis, MO 63120 (314) 389-4140...
Page 3
NOTE: REFER TO EACH INDIVIDUAL INSTALLATION DRAWING OF PRODUCT FOR ASSEMBLY INFORMATION, HARDWARE BAG, AND PACKING LIST. Sportsplay Equipment, Inc 5642 Natural Bridge, St. Louis, MO 63120 (314) 389-4140...
Need help?
Do you have a question about the SENSORI TUNNEL 521-105 and is the answer not in the manual?
Questions and answers