G O M + 표 준 형 - 영 문
Install the unit by maintaining at least 600mm space between any electricity facilities.
Do not install near any location where there are many traffic of people.
Do not install near any stairs or emergency exit.
Ensure sufficient space for product inspection and repair.
For repair and inspection, the front of the unit should have at least 600mm of space.
Please should be prepare water discharge hole (Device) at
boiler installation.
Please do not install the unit above any
combusting appliances or near any air
conditioning units.
This may cause improper combustion causing CO
poisoning.
Please do not install the unit in a location
where there are any corrosive materials
such as ammonia, chlorine, sulfur, and acids.
Boiler will be damaged quicker and cause
improper combustion leading to CO poisoning.
Recommendations
37
Need help?
Do you have a question about the KDB-101GOM+ and is the answer not in the manual?