The machine can now be laid down so it rests on the chute. If possible, place a piece of
cardboard under the chute to avoid scratching the paint.
P. Lindberg A/S
Tel.: +45 7021 2626
Place the feed chute securely on the
spindles and lock the chute securely with
two nuts. Ensure that the package sits
correctly!
Mount the support bar with two bolts.
Ensure that it is correctly positioned.
See the rubber support.
Mount the discharge chute with four bolts.
It is advisable that two people perform this
task – so that one person can hold the
chute while the other attaches the screws!
12
Sdr. Ringvej 1
DK-6600 Vejen
MAN 9060752 EN V3
www.p-lindberg.dk
e-mail: salg@p-lindberg.dk