Fronius Acctiva Easy 1202 Operating Instructions Manual page 31

Battery charging system
Hide thumbs Also See for Acctiva Easy 1202:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21
Testing battery
6
startability (Accti-
va Easy chargers
only)
7
8
9
If there is no start process after 30 seconds, the charger switches automatically to the al-
ternator test. If the start process is not possible, charge or check the battery.
Testing the alter-
While the engine is running, the charger checks the voltage the alternator is supplying to
nator (Acctiva
the battery.
Easy chargers
1
only)
2
Alternator voltage
OK.
3
After the open circuit voltage test, the charger switches automatically to the startability
test and awaits the start process
Start engine
Charger checks the voltage behaviour of the battery during the start process
Charger displays battery startability for 15 seconds
very good starting
response
Alternator test running. Let engine run for approx. 30 seconds at 1500-2000 rpm
Charger displays alternator test result.
Alternator voltage
OK. Possible prob-
lems on short jour-
neys or in winter.
To finish the test, disconnect from battery or connect charger to mains supply to begin
charging.
poor starting response
Alternator voltage
Alternator voltage
too high. Have alter-
too low. Have alter-
nator checked in
nator checked in
workshop.
workshop.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents