Connecting Required Cables - Aruba 310 Series Installation Manual

Hide thumbs Also See for 310 Series:
Table of Contents

Advertisement

mount adapters for other rail adapters for other rail styles are available as accessory kits.
!
The installer is responsible for securing the access point onto the ceiling tile rail in accordance with the steps
below. Failure to properly install this product may result in physical injury and/or damage to property.
1. Pull the necessary cables through a prepared hole in the ceiling tile near where the access point will be
placed.
2. Place the adapter against the back of the access point with the adapter at an angle of approximately 30
degrees to the tabs. See
3. Twist the adapter clockwise until it snaps into place in the tabs. See
Figure 7
4. If necessary, connect the console cable to the console port on the back of the access point.
5. Hold the access point next to the ceiling tile rail with the ceiling tile rail mounting slots at approximately a 30-
degree angle to the tile rail. See
6. Pushing toward the ceiling tile, rotate the access point clockwise until the device clicks into place on the
ceiling tile rail.
Figure 8
7. On the (I)AP-314, install the external antennas according to the manufacturer's instructions, and connect the
antennas to the antenna interfaces on the access points.

Connecting Required Cables

Install cables in accordance with all applicable local and national regulations and practices.
Software
Aruba 310 Series requires ArubaOS 6.5.0.0 or higher. For instructions on choosing operating modes and initial
8
Figure
7.
Attaching the Ceiling Rail Adapter
Figure
Mounting the Access Point
8. Make sure that any cable slack is above the ceiling tile.
Aruba 310 Series Access Points | Installation Guide
Figure
7.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap-314Ap-315Iap-314Iap-315

Table of Contents