Download Print this page

Advertisement

Quick Links

!
TELGUARD POWER SUPPLY UNITS MUST BE USED AND SHOULD NOT POWER ANY OTHER EQUIPMENT.
A SITE SIGNAL NETWORK TEST IS TO BE UNDERTAKEN BEFORE INSTALLATION
OPTIMUS KIT
CONFIGURATIONS
AND
MAIN OPTIMUS KIT HUB PCB
HUB and SATELLITE
CONNECTIONS:
www.optimus-uk.com
T | +44(0)1306 710120
CONNECTIONS
OPTIMUS KIT I/O BOARD
Used ONLY in Optimus KIT Satellite Panel
External Speaker from
Satellite Panel(s)
12V Supply to Satellite
External Mic from
Satellite Panel(s)
External CAN Bus
to/from Satellite Panel(s)
Wire Hi to Hi / Lo to Lo /
0V to 0V
WHEN CHANGING RELAY MODULES
E | info@optimus-uk.com
Expansion CAN Bus
Socket for Displays,
GREEN Flashing
= Normal Operation
Onboard Solid State Relay
60V AC/DC
200 mA
STATUS LED RED Closed
z
z
Ensure Correct Alignment
Power Off
INSTALLATION GUIDE
OPTIMUS KIT ECO SAT PCB
Used ONLY in Optimus KIT Satellite Panel
Keypads etc.
OK LED
SEE REVERSE FOR INSTALLATION TIPS

Advertisement

loading

Summary of Contents for Optimus OPTIMUS KIT

  • Page 1 INSTALLATION GUIDE CONFIGURATIONS CONNECTIONS MAIN OPTIMUS KIT HUB PCB OPTIMUS KIT I/O BOARD OPTIMUS KIT ECO SAT PCB Used ONLY in Optimus KIT Satellite Panel Used ONLY in Optimus KIT Satellite Panel Expansion CAN Bus Socket for Displays, Keypads etc. OK LED...
  • Page 2 TELGUARD POWER SUPPLY UNITS MUST BE USED AND SHOULD NOT POWER ANY OTHER EQUIPMENT. A SITE SIGNAL NETWORK TEST IS TO BE UNDERTAKEN BEFORE INSTALLATION OPTIMUS KIT INSTALLATION GUIDE INSTALLATION TIPS CONFIGURATION EXAMPLE: Connectors on Satellite PCB can be daisy chained to other Satellite panels, or wired back to the hub.