Honeywell LC13-510 Manual page 57

Dual node module service
Table of Contents

Advertisement

6.1 VISUAL CHECKS
• Check the Module power and signal cables to ensure that they are present and tight.
• Check the ground strap on rear of chassis for good connection.
• Ensure that all boards and power supply(s) are fully inserted into the connectors and that
board retainers are secured.
6.2 INITIALIZE NODE
• Turn the power on by pressing the "1" side of the power switch. After 2 minutes or
less, all red LEDs should be off and all green LEDs should be on, and the alphanumeric
display should indicate the address of the node. If not, check indicators and LEDs in
accordance with subsection 3.2, Test Procedures.
• If this is not a History Module, press the
above.
* In the case of the History Module only, if you press the RESET button indiscriminately while
the system is operating, you may cause damage to the data stored on the hard disk. See
subsection 3.2, Troubleshooting , in the History Module Service manual, part of the LCN
Service binder, for complete details.
When you replace or restart a board or module with an outstanding maintenance
recommendation, be sure to make an SMCC corrective action entry. Otherwise, the system
will not start a recount of errors. See the System Maintenance Guide in the LCN Service
binder for additional information on this procedure.
Dual Node Module Service
* button. Check displays and LEDs as
RESET
W A R N I N G
NOTE
6-1
6
STARTUP
Section 6
9/95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents