Checklist Of Start-Up Check Points - Carrier AiroVision 39 HQ Installation, Operation And Maintenance Instructions

Table of Contents

Advertisement

20

9. CHECKLIST OF START-UP CHECK POINTS

9.1. Checklist of Start-up Check Points
The table below shows a general overview of the planning required to facilitate the installation of the AHU.
The following pages give a more detailed description of the individual components.
!CAUTION!
Before starting up the AHU ensure that the components have the correct
connection voltage and connect them in accordance with the regulations. The
doors and access covers must be closed and the AHU must be earthed.

Advertisement

Table of Contents
loading

This manual is also suitable for:

39 hq

Table of Contents