22
9. START-UP CHECK-LIST
9.1. Start-Up Inspection Items Check-list
The table below shows a general overview of the planning required to facilitate the installation of the AHU.
The following pages give a more detailed description of the individual components.
CAUTION!
Before starting up the AHU ensure that the components have the correct connection voltage and con-
nect them in accordance with the regulations. The doors and access / guard covers must be closed and
the AHU must be earthed.
9.2. Start-up Inspection Items