Advertisement

A 2
www.a nd erse n- ev.com
A2-012020V1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the A2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Andersen A2

  • Page 1 A2-012020V1...
  • Page 2 ANDERSEN A2 OPERATION LED STATUS SETUP MULTI FUNCTION OPERATION System powering up. Red, Amber, Green Reset RCM (Two button presses) LED flash together twice a second Standby State (solid green) Enter Network setup mode (Three button presses) Vehicle connected state (solid green & solid...
  • Page 3 Step 1: Fix A2 unit to wall 6mm penny washer 6mm washer we don’t provide these screws Notes: If the mounted surface is uneven use TIP! spacers to ensure Drill template on the the unit core is sitting bottom of the unit...
  • Page 4 Step 2: Prepare A2 core for supply cable entry Note: Default cable entry is this can be done on wall from the rear See Fig: 1 Bottom entry drill out cable entry section with 20 25mm hole saw, see Fig :2...
  • Page 5 Step 3: Terminate supply power cable Single Phase installation Single Phase installation Three Phase installation Three Phase installation TIP! Suggested cable types PVC or Incoming single Incoming three phase supply phase supply Note: Important. HI TUFF cable not Make sure the recommended, It gland is tightened is very difficult to...
  • Page 6 Sensor orientation +44 (0) 203 8904510 can be adjusted in Recommended Cable: dashboard using a load Shielded twisted reference i.e. kettle 3Kw pair e.g. CAT5e/CAT6 Andersen Chat Recommended Cable: Shielded twisted pair e.g. CAT5e/CAT6...
  • Page 7 Step 5: Terminate vehicle side charge cable Single Phase cable Three Phase cable L2 L3 L2 L3 Important. Ensure cable stress relief clamp is correctly tightened Important. Make sure the gland is tightened after cable installation!
  • Page 8 Step 5: Terminate vehicle side charge cable Single Phase cable Three Phase cable L2 L3 L2 L3 Important. Ensure cable stress relief clamp is correctly tightened Important. Make sure the gland is tightened after cable installation!
  • Page 9 Step 6: Fit weather project covers M3 x 16mm long Torque setting must be countersunk screw 2.5nM steel A: Fit Output terminal cover Ensure seals are correctly positioned and fixing screws correctly torqued to 2.5nM B: Fit input terminal cover Ensure seals are correctly positioned and fixing screwscorrectly torqued...
  • Page 10 Step 7: Fit side panels Click input side panels Note: For further tips and tricks see our support videos...
  • Page 11 Step 8: Fit cable brushes M3 x 16mm long screw Secure side panels by fitting brush panels and fixing screws to 2.5nM...
  • Page 12 Step 9: Fit lid panel M5 x 8mm counter sunk screw A: Click lid panel into the B: Inert and tighten lid lid core fixing screws Note: For further tips and tricks see our support videos...
  • Page 13 Step 10: Fit bottom panel M3 x 16mm long screw B: Tighten screws to 2.5nM A: Fit bottom cover Note: For further tips and tricks see our support videos...
  • Page 14 Step 11: Fit front panel M5 x 12mm long screw A: Ensure the front panel mounts are located into the slots correctly B: insert and tighten front panel screws correctly torqued to 5nM .
  • Page 15 Danger Danger to life due to electrical voltage! Injuries due to electric shock and/or burns, possibly resulting in death, are possible. During all work, make sure at all times that power to the system is switched off and secured so it cannot inadvertently be switched on. •...

Table of Contents