S&P HTB-2500 Installation And Instruction Manual page 15

Hide thumbs Also See for HTB-2500:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 12
1. (Figure 2) Extract the safety clip (1) and lower pin (2) from the pole. Unscrew the upper
screws (3-4) to remove the pin upper ball joint. This will make it easier to pass the cables
through the inside of the pole.
2. (Figure 3) Put the pole (5) through the centre of the upper (4) and lower (6) couplings.
Then thread the motor cables and metal safety cable through the pole. Attach the pole to
the motor using the two screws provided (3). Put the lower pin (2) back in place and lock it
with the safety clip (1).
Also, put the upper pin back on the pole, and fi rmly fi x the upper ball joint using the screws
(6-7).
3. (Figure 4) Drill four 10 mm diameter holes and one of 12 mm diameter. Attach the cei-
ling bracket with the four expansion metal anchors of 10 mm diameter (1), washers and
screws provided.
Then fi x the expansion metal anchor of 12 mm diameter (2) to fi x the security cable.
Make sure the screws are properly tightened and the bracket is secure (not moving at all).
WARNING: The ceiling or structure the device is attached to must be strong enough to
hold 100 kg/ 20 cm
4. (Figure 5) Attach the pole to the ceiling bracket. To prevent the pole from counter-rotating,
turn the whole piece until the slot on the pole (1) slides onto the spring on the ceiling brac-
ket (2).
Thread the metal safety cable (3) through the ceiling bracket and secure it by tightening
the nut on the safety bolt (4). Then thread the safety cable inside the hole of metal anchor
of 12 mm diameter and secure with the second safety bolt (5).
5. ELECTRIC CONNECTION (Figure 6)
WARNING: Before connecting the fan make sure it is switched off at the mains and the vol-
tage supply coincides with that indicated on the appliance characteristics plate.
1. Connect the motor cable to the electronic control box (1).
2. Connect the cables to the control box (L-brown/N-blue) to the terminal block (2), which
is fi xed on the side of the ceiling bracket
3. Connect the grounding cable from the support pole (yellow-green), with the grounding
cable of the ceiling bracket.
4. Connect the grounding cable from the ceiling bracket (yellow-green) and the grounding
cable from the control box in the same terminal block
5. Connect the electric power supply from the installation, in the free side of the terminal
block.
6. Then place the electronic control box inside the ceiling bracket and cover it with the deco-
rative cover (3). Make sure not to pinch the antenna cable (4). Attach the decorative cover
with the four screws provided (5).
2
.
(2).
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Htb-3000

Table of Contents