3.4 Installation Details for Air Panels
● Installation work for air panel should be done according to the Installation Manual for Air
Panel.
● Ensure that the connector between indoor unit and the air panel is properly connected.
10 to 35
Surface of Flange
Indoor Unit (Viewed from Bottom Side)
a .For Ceiling already Completed with Panels
Attach the scale to the
bottom side of the unit.
Checking Scale for
Dimension of Opening
b . Ceiling not Completed with Panels yet
Pattern Paper
for Installation
Dimension for
Opening
Indoor Unit
Surface of Ceiling
Installation and Maintenance
Slub
Indoor Unit
10 to 35
Surface of Ceiling
Attach the scale to the
face of ceiling.
Adjust the height of the ceiling
and the unit at each corner.
Check the dimension of opening
at each side.
Dimension for
Opening
Suspension Bolt
Screw(M6)
Pattern Board
for Installation
17
(mm)