Fanimation PYLON LP8277 Series Instructions Manual page 8

Table of Contents

Advertisement

Available languages

Available languages

How to Assemble Your Ceiling Fan (Continued)
6. Route wires through motor coupling cover, canopy
screw cover and ceiling canopy. (Figure 6)
7. Reinstall the hanger ball on the downrod as follows.
Route the black, white and blue wires through the
hanger ball. Position the pin through the two holes in
the downrod and align the hanger ball so the pin is
captured in the groove in the top of the hanger ball.
Pull the hanger ball up tight against the pin. Securely
tighten the set screw in the hanger ball. A loose set
screw could create fan wobble. (Figure 7)
8. Cut off excess lead wire approximately 6 to 9 inches
above top of the downrod. Strip insulation off 1/2 inch
from the end of each lead wire. (Figure 8)
NOTE: All set screws must be checked, and
retightened where necessary before installation.
9.
Remove one of the two shoulder screws in the
hanger bracket and retain the screw for later. Loosen
the second shoulder screw without fully removing it.
(Figure 9)
Motor Coupling
Cover
Hanger Bracket
8
Ceiling Canopy
Canopy Screw
Cover
Figure 6
Figure 7
Figure 8
Figure 9

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pylon lp8277lmwPylon lp8277lbl877480877481

Table of Contents