2.6
L
EVELING
After the machine is placed on its location and the cover is opened, the next steps should be fol-
lowed.
F
2.8
IGURE
Y- level
F
2.9
IGURE
1.
Adjust the threaded feet of the machine until it stands perfectly in both X and Y direction.
A spirit level should be placed on the frame for checking the X direction. For the Y-
direction the spirit level should be placed on both conveyorbars.
2.
When machine is leveled, tighten the nuts (A). See
After this procedure the machine is mechanically correct installed.
Installation manual myReflow
2.6 - L
EVELING
A
B
A
DJUSTING LEVEL
TOPVIEW
X- level
L
EVELING
36 mm open
ended spanner
17 mm open
ended spanner
spirit-level
Figure
2.8)
57-139mm
SIDEVIEW
7
C
2
HAPTER
Need help?