Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
2. Put the vibrator head approximately 15 cm / 6 in. (A)
down into the nearest lower layer of concrete. This
causes the layers of concrete to mix correctly.
C
3. Wait approximately 10–20 seconds until the surface
around the vibrator head is shiny and no air bubbles
come to the surface.
Introduction
WARNING: Read and understand the safety
chapter before you do maintenance on the
product.

Maintenance

Clean the product.
Clean the cooling fins of the motor.
Make sure that the controls can move smoothly.
Examine the commutator and the commutator mem-
brane for damages.
Lubricate the flexible shaft.
Examine the carbon brushes. Replace the carbon brush-
es if they are worn or damaged.
8
4. Remove the vibrator head slowly to let the concrete
fill the hole from the vibrator head.
5. Put the vibrator head down into the concrete at a
distance of 30–50 cm / 12–19 in. (C) from where you
put it before.
6. Do step 4 and 5 again and again. Continue until the
air bubbles are fully removed from the area of
concrete.
To stop the product
1. Move the power switch to "O", the OFF position, to
B
stop the product.
2. Disconnect the product from the power socket.
A
Maintenance
Maintenance schedule
* = General maintenance done by the operator. The
instructions are not given in this operator's manual.
X = The instructions are given in this operator's manual.
Before use, each
10h
X
*
*
Each 2 weeks,
Each 5 weeks,
100h
*
X
X
1135 - 001 - 20.11.2019
250h

Advertisement

Table of Contents
loading

Table of Contents