Connecting The Water Lines - Cornelius ENERGIZE 6 Installation Manual

Backroom soda chiller package
Table of Contents

Advertisement

Energize6 Installation Manual
Connecting the
Water Lines
Publication Number: 621058457INS
Two incoming 1/2" water lines from the water management system are connected to
the Energize6 unit on the right end of the unit, as shown in Figure 12. Perform the pro-
cedure in Table 6 to connect the water lines.
Step
To fill the water bath remove the cover from the unit. Loosen the cover
1
attaching screws on the ends of the unit.
2
Lift the cover up, as shown in Figure 13, and store it in a safe place.
Open the valve to the water bath, shown in Figure 14, and fill the water
3
bath up to the top of the overflow tube, shown in Figure 15.
When the water bath is full, replace the cover on the unit or continue on
4
to Table 7 to install the CO
Cover
Attaching
Screw
- 16 -
Water Lines In
Figure 12.
Table 6.
Action
lines.
2
Figure 13.
© 2012, IMI Cornelius Inc.

Advertisement

Table of Contents
loading

Table of Contents