Cornelius ENERGIZE 6 Installation Manual page 25

Backroom soda chiller package
Table of Contents

Advertisement

© 2012, IMI Cornelius Inc.
Step
Remove the front access panel and turn on the compressor by moving
the compressor switch on the master controller to the ON position, as
5
shown in Figure 24. The compressor should start and begin to cool
after a 3 to 5 minute time delay.
6
The unit will start to build an ice bank. (approx. 2.5 hrs @ 75 °F)
Turn on the carbonator pump motors by moving the carbonator pump
switches to the ON position. (see Figure 24)
If the water inlet pressure is within specifications, the carbonator pump
7
fills the carbonator and then switches off when the upper fill level is
reached. The carbonator tanks are located inside the water bath, as
shown in Figure 2 on page 5.
Bleed air out of the carbonators and the dispensers by pulling up on the
8
ring attached to each relief valve, as shown in Figure 25.
Do not turn on the recirculation switches (Figure 24) until ice starts to
9
form on the evaporator coils.
10
Replace the cover on the unit.
Smart Indicator
LED Status Indicator
LED
Green
ON
Voltage OK
OFF
No Power
Blinks
HIGH or LOW Voltage
Yellow
- 21 -
Energize6 Installation Manual
Table 10.
Action
Figure 22.
Figure 23.
Table 11.
Warning
None
Check/Reset Power
Check/Reset Power
Publication Number: 621058457INS