Maintenance And Servicing; Maintenance Schedule - Beko BEKOMAT 8 Installation And Operating Manual

Hide thumbs Also See for BEKOMAT 8:
Table of Contents

Advertisement

Installation and operating manual

6. Maintenance and servicing

DANGER
Insufficient qualification
Improper handling and operation of the device might result in serious or even fatal injury, and/or
serious damage to property.
Recommended interval: 1x per year
Wearing parts kit to be used:
BEKOMAT
®
8
2000450
BEKOMAT
®
9
4005382
Preparation:
Close inlet
Press TEST button until BEKOMAT
Disconnect BEKOMAT
®

6.1. Maintenance schedule

Maintenance
Function test
Press the TEST button
Visual inspection
Maintenance
Replace wearing parts (kit)
Perform leakage test
Perform function test
Check adhesive label and replace, if necessary
Check valve core length
Check cable connections
Clean
Function test:
We strongly recommend performing a daily function test of the BEKOMAT
To test the solenoid valve, press the test button briefly (for approx. 2 seconds).
 The BEKOMAT
starts a manual drain cycle.
®
To test the alarm function, close the condensate inlet and press and hold the test button for approx. 1 minute.
 The BEKOMAT
starts a manual drain cycle and triggers an alarm.
®
During this test, large volumes of compressed gas might enter the condensate collection line.
Maintenance:
For more information regarding the maintenance of the device, contact the manufacturer.
20
All maintenance tasks must be performed by service personnel of BEKO TECHNOLOGIES GmbH or
an authorised BEKO partner.
is depressurised
®
from power supply
daily
annually
.
®
Interval
BEKOMAT
EN
8/9
®

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bekomat 9

Table of Contents