Bailey INFI 90 Instruction page 67

Infi-net to computer interfaces
Hide thumbs Also See for INFI 90:
Table of Contents

Advertisement

MAINTENANCE
Checking Connections
PREVENTIVE MAINTENANCE PROCEDURES
6 - 4
Check all signal wiring, power and ground connections within
the cabinet to verify their integrity. When checking connec-
tions, always turn a screw, nut or other fastening device in the
direction to tighten only. If the connection is loose, it will be
tightened. If the connection is tight, the tightening action will
verify that it is secure. There must not be any motion done to
loosen the connection.
NOTE: Power to the cabinet must be off while performing this pre-
ventive maintenance task.
Check and verify that all cable connections are secure.
®
I-E96-610A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Infi-net inici01Infi-net inici03

Table of Contents