UNPACKING
NOTICE: Do not discard the carton or other packing materials until
you have inspected the equipment and tested it for proper
operation.
1. Remove all packing material and tape, as well as any protective
plastic from the equipment. When no longer needed, dispose of all
packaging and materials in an environmentally responsible manner.
2. Clean any glue residue left over from the plastic or tape.
3. Read and understand all labels and diagrams installed on
equipment.
4. Carefully check for and account for all components and accessories
before discarding packaging materials.
5. Place the Downdraft Vent Module on a stable, level surface.
SETTING UP THE EQUIPMENT
Toe Kick Installation
If your Downdraft Vent Module includes toe kicks, they will need to be
installed. There are four toe kicks, one for each side of the base. The
operator side toe kick is open in the middle.
Tools Required
Right-angle drill
Remove or Loosen Screws from the Base
The V-Class base is illustrated. Installation on a Signature Server
is similar.
Loosen
Remove
Loosen
1. Remove the corner screws from the base. There are two in each
corner. Retain for installing the toe kicks.
2. On the operator and customer sides of the base, remove the screw
adjacent to the corner. Retain for installing the toe kicks.
3. Loosen the remaining screws – two on each side of the base.
Down Draft Vent Module with Induction Range(s) Operator's Manual
®
base
Remove
Loosen
Remove
Loosen
Remove
6. Level the Downdraft Vent Module. The included adjustable legs can
be used to level the Downdraft Vent Module or align it with other
equipment. Leg length is adjusted by rotating the leg. Adjust each
leg until the Downdraft Vent Module sets firmly on all legs and is
level front-to-back and side-to-side.
7. If applicable, install the included toe kicks.
8. Ensure a properly grounded electrical supply matching the
nameplate rating is available to the unit.
9. Contact your local ANSUL dealer to install the fusible links, apply
power, test, charge, arm, and commission the ANSUL Fire
Suppression System. Go to ANSUL.com to find a local dealer.
Install the Toe Kicks
Align notches
with screws
1. Install the customer side toe kick:
Align the notches on the toe kick to the middle screws on the base.
Slide the toe kick onto the middle screws. Insert the screws adjacent
to the corner. Tighten the screws just enough to hold the toe kick in
place.
2. Install the end toe kicks:
Position the end of the toe kick so it is overlapped by the customer
side toe kick. Align the notches on the toe kicks to the middle
screws. Tighten the screws just enough to hold the toe kick in place.
Follow the same process to install the other toe kick to the other end
of the base.
3. Reinstall and tighten the corner screws on the customer side of the
base.
4. Install the operator side toe kick:
Position the end of the toe kick so it is overlaps the end toe kicks.
Align the notches on the toe kick to the middle screws on the base.
Slide the toe kick onto the middle screws. Insert the screws adjacent
to the corner. Tighten the screws just enough to hold the toe kick in
place.
5. Reinstall and tighten the corner screws on the operator side of the
base.
6. Tighten all screws until the toe kicks are securely installed.
Overlap
corners
Align notches
with screws
3