Installation; Ps D75 - ABB PS D75 840 Series Installation And Maintenance Instruction

Table of Contents

Advertisement

3. Installation

3.1
PS D75 ... 840 without built-in electronic overload protection.
Protective earth
Connect the protective earth at terminal marked
The terminal is placed on the right hand side on smaller units and directly on the mounting plate for
medium and larger sizes.
Main circuits
The supply side of the softstarter has terminals marked 1, 3, 5.
The motor side is marked 2, 4, 6.
Note: Softstart PS D is not phase sequence sensitive.
1
3
5
Softstart
2 4 6
M
Control circuit
Apply control voltage at terminals marked 1 and 2. See below, "Power Supply"
Make sure that the ordered version corresponds to your rated voltage.
It is not possible to change the control voltage of the softstarter.
Power supply
110-127V, 50-60 Hz
220-240V, 50-60 Hz
Connect terminals no. 3 with no. 4 and no. 5 with no. 6
Supply at terminals no. 1 and no. 2
Connect terminal no. 4 with no. 5
Supply at terminals no. 1 and no. 2
- 9 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents