Ps D75 - ABB PS D75 840 Series Installation And Maintenance Instruction

Table of Contents

Advertisement

3.2
PS D75 ... 840 / PS DH30 ... 720 with built-in electronic overload protection.
To comply with the EMC-directive 89 / 336 / EEC see instructions on page 3:
Protective earth
Connect the protective earth at terminal marked
The terminal is placed on the right hand side on smaller units and directly on the mounting plate for
medium larger sizes.
Main circuits
The supply side of the softstarter have terminals marked 1, 3, 5.
The motor side is marked 2, 4, 6.
Note: Softstart PS D and PS DH is not phase sequence sensitive.
1
3
5
Softstart
2 4 6
M
Control circuit
Apply control voltage at terminals marked 1 and 2. See below, "Power Supply"
Make sure that the ordered version correspond to your rated voltage. It is not possible to change the
control voltage of the softstarter.
Power supply
110-127V, 50-60 Hz
220-240V, 50-60 Hz
Connect terminals no. 3 with no. 4 and no. 5 with no. 6
Supply at terminals no. 1 and no. 2
Connect terminal no. 4 with no. 5
Supply at terminals no. 1 and no. 2
- 11 -