REED M2200 Technical Manual page 48

Table of Contents

Advertisement

OPERATION and MAINTENANCE
EVERY 250 HOUR MAINTENANCE CHECKLIST
Actual Hours
# Maintenance Description
1
Change hydraulic filters (or change more frequently as indicated by indicator
gauge on filter)
Additional Notes:
2
Check that all electrical wires, cables, terminals, plugs are in good condition
Additional Notes:
3
Change engine oil and filters (see engine manufacturer guide for all engine
requirements) IF REQUIRED
Additional Notes:
4
Check condition of fuel hoses, fittings, and clamps
Additional Notes:
5
Inspect all safety decals to ensure that they are completely visible and legible
6
Perform complete inspection of the controls
7
All toggles in good condition, stay in position or momentarily return to center
8
Control identification in good condition, legible
9
Perform complete inspection of the controls
10
All toggles in good condition, stay in position or momentarily return to center
11 Control identification in good condition, legible
Gauges in good condition
12
Additional Notes:
Rev *
www.reedpumps.com
(909)287-2100
Date
/
/
Initials
47 of 51

Advertisement

Table of Contents
loading

Related Products for REED M2200

Table of Contents