Operation Of Pan Mixer - REED M2200 Technical Manual

Table of Contents

Advertisement

OPERATION and MAINTENANCE

OPERATION OF PAN MIXER

PREPARING FOR SYSTEM START-UP
AFTER ALL CONNECTIONS HAVE BEEN MADE AND THE APPROPRIATE POWER HAS
BEEN SUPLIED TO THE CONTROL BOX THE LICENSED ELECTRICTIAN CAN TEST FOR
PROPER ROTATION OF THE ELECTRIC MOTOR AND ALL SUPPORTING CONNECTIONS.
THE OPERATOR SHOULD FAMILIARIZE HIMSELF WITH THE CONTROLS AND LOCATION
OF HIS FEET TO BE SAFE ON THE DECK.
THE HOPPER GRATE MUST BE CLOSED
opening of the mixer grate there will be more on this later)
SYSTEM START-UP
2
3
1. THE MIXER SWITCH MUST BE IN THE OFF POSITION.
THEN THE SYSTEM SWITCH CAN BE TURNED ON.
2. TURN ON THE SYSTEM ON-OFF SWITCH TO
SWITCH WILL BE FLASHING ALONG WITH THE 'E' STOP LIGHT.
3. THE HORN SWITCH MUST BE "PRESSED" TO ALERT WORKERS IN THE AREA OF
A CHANGE IN CONDITION THAT COULD BE LIFE THREATENING, AND THE LIGHTS
SHOULD STOP FLASHING AND GO TO A CONSTANT ON CONDITION. IF THIS DOES
NOT HAPPEN THERE IS A PROBLEM IN THE SYSTEM THAT MUST BE ADDRESSED.
(I.E. hopper open, motor switch on, poor connection somewhere.)
READY CONDITION "SOLID LIGHT"
E-STOP CONDITION "FLASHING LIGHT"
Rev *
(There is a safety interlock that guards against the
1
"ON"
THE LIGHT IN THE SYSTEM ON
www.reedpumps.com
(909)287-2100
2
27 of 51

Advertisement

Table of Contents
loading

Related Products for REED M2200

Table of Contents